Old Laundry - Haddo Estate 30kW bio-box with pitched roof to suit Planning requirements. The boiler serves three houses via a mini-district heating system incorporating heat exchangers at each property. Each house tenant will be charged for their heat use via individual heat meters with remote readouts. The boiler uses wood chip from forestry on the Estate. |

|
Little Methlick - Haddo Estate 30kW bio-box serving two houses via a mini-district heating system incorporating heat exchangers at each property. Each house tenant will be charged for their heat use via individual heat meters with remote readouts. The boiler uses wood chip from forestry on the Estate. |

|
Raxton Farm - Haddo Estate The 49kW bio-box was designed to heat four dwellings on the site. The houses are to be connected via a mini-district heating system incorporating heat exchangers at each property. Each house tenant will be charged for their heat use via individual heat meters with remote readouts. Currently only one house is complete and connected, therefore the use of a temporary buffer vessel was necessary. The boiler uses wood chip from forestry on the Estate.
|
|
Projects |


|
Construction Headquarters - Inverurie bio-box with 75kW pellet boiler The boiler serves a new office and workshop headquarters building for a regional construction company. The unit is arranged for blown pellet deliveries and can accommodate 11 tonnes of fuel. |